Highway 40 closed to allow Bellemare Transport, Engineering & Logistics to move a huge technical part for the REM
On March 2, Groupe Bellemare’s Transport, Engineering & Logistics Division transported the launcher nicknamed “Marie” for the assembly and installation of the aerial structure of the REM (Réseau express métropolitain). This was a highly delicate transport operation since it is the longest piece to have been moved on the Quebec road network: 126 tons over […]